Godiva House
-
Services:
Gas to Electric
-
Value:
Not Disclosed
Edmond Shipway acted as the M&E Consultants for the replacement of three gas-fired boilers at the Coventry Building Society Head Office – Godiva House, with a 2 stage heat pump system to achieve high temperature LTHW, alongside solar PV installations. This upgrade was implemented to reduce reliance on fossil fuels and support the client’s efforts in lowering carbon emissions.
- Decarbonisation Scheme
- Initial Feasibility Study
- RIBA Stage 4 design
- Replaced 600kW Gas Fired Boilers
- 2 Stage High Temperature Heat Pumps
- Solar PV
- Saved 79tonnes CO2 emissions/ annum
- Neutral running costs